I am sure I will finish it.... one day :)
Monday, January 9, 2012
Flowers
I am sure I will finish it.... one day :)
Tuesday, January 3, 2012
12 WIPs in 12 Months
As I mentioned in my last post (am I really posting two days in a row, shock horror ) I intend to make some more time to sew for me alongside my Two Little Monkeys sewing.
Luckily AJ came up with a challenge that will encourage me to not only sew more but get some of my huge WIP list finished. Now more info about the challenge can be found here and here but the gist of it is
- Entry fee of 1 FQ to be sent to AJ to compete for the grand prize at the end of the 12 months
- For each month that you finish a WIP you get an entry to the grand prize draw (plus an extra entry for blogging about it)
- 6 of the projects have to be true WIP 'already started' which shouldn’t be a problem as my current list shows 17 and I know there is at least two more to add to it. The other 6 can be not started but you must be previous planned and either material or pattern owned (or drawn up for pattern) While I have at least 9 in that category as well.
My only problem is that most of my WIP still need a lot of work on them so apart from the 6 that are am going to list here I will choose the others that I will do during the year.
Monkeys & Lions Quilt - This just needs the binding sewn down
Arabella – This was my MIL’s Christmas present for 2010 (oops) just need to send it off to be quilted and then bound
Bastian’s Plane Quilt – I need to remove all the stabiliser from behind the appliqued planes and then once I getting the backing fabric also needs to be sent out to be quilted and then bound. I don’t have a photo of this one but it is this quilt
Charm Square quilt along – Also don’t have a photo of this but I have the quilt top almost finished just need to add the borders, not sure if I have the backing or not for this one. Once again needs to be sent out to be quilted and then bound. This is a photo of the first block I finished.
Pram Quilt – this was meant to be for Lachie but I never got around to finish it. It is going to be backed in two layers of mint green microfleece, I might add some pink flowers or shapes to it before sandwiching it and give it to my cousin for her little girl that is due in Feb.
Snowballs - This is an advent calendar that I started Nov 2010, did some more Nov 2011 at a quilt retreat and would really like to have it finished for Christmas 2012
My last one is an unstarted one, I bought myself a Odyssea by Momo jelly roll either Christmas 2010 or 2009 waiting for the perfect project and found it while at the quilt retreat in Nov last year. Then at my last market for 2011 I found the pattern I was after at Bella’s Patchwork stall. I decided that I really want to start a new project at the first MMQG SASD in two weeks time so this will be it.
Just need to find some material for the borders and get some white Emma Louise for the background
So I think given that I finished no quilts last year that if I get all of those done I will be doing well.
Saturday, January 1, 2011
Holiday Sewing
One of the many projects that I started during the year was the Homespun “Life is a Celebration” Mystery block of the month, if I had kept up I should have the whole quilt finished, however I have just finished my second block.
I have also made a good start of the third block so hopefully I will be able to show you that one completed shortly
Thursday, October 14, 2010
Blogtoberfest – Day 14 (My Creative Space)
Another sneak peak of the EB Quilters Doll Quilt Swap #4
For more creative spaces head over to KootoyooThursday, October 7, 2010
Blogtoberfest – Day 7 (My creative space)
A sneak peek of the doll quilt I am making for EB Quilters Doll Quilt Swap #4
For more creative spaces head over to KootoyooSaturday, August 7, 2010
Swaps, Shopping and Stuff
This is the one I received from Bec
I have also been making a few purchases lately. Firstly I went to Melbourne Craft & Quilt Show a couple of weekends ago and was very restrained in my spending. I got was Janelle Wind’s first book Pieces of Me, and a this kit to make Melly & Me’s Fat Quarter bag
I have to admit that I am quite proud of myself as I have already made one project out of the book, started and finished it all in one day. One of the reasons why I purchased this book was for this specific project.
Isn’t it cute, it is a cover for my Iphone and has a small pocket on the front which is the perfect size to hold my ATM/credit card and some loose change. I have also order some fabric from this lovely store to make two bags out of this book.
Actually I have purchased quite a lot from that store recently as well as the fabric I have three Christmas related kits on there way to me, a advent calendar, reindeer stocking and Christmas wreath. There were all part of QFD Christmas in July online event so I am unable to post photos of the patterns but if you have a look over here you can see some pictures of some of the projects I got kits for. Another purchase I made from QFD was this lovely soft flannel
I am going to team it with the FQ pack of Ginger Blossom that my lovely EB friends gave me as a thankyou for running the Round Robin Swap last year. I plan to make a half sq triangle quilt like Esther’s using the flannel as one half of the sq and the cotton as the other half, hoping it will look as I imagine.
I have also been working on the Freckled Whimsey Charm Pack Quilt along and am now up to date.
Monday, July 26, 2010
Another finished quilt
Wednesday, July 7, 2010
Hectic
and decided it was about time I update you on what I have been doing.
So what have I been doing......
Not Much......
Andrew has been spending crazy hours with his pet work project which has left me feeling like a single mum at the moment, not a nice feeling I can tell you. Mind you we have plans for this weekend once it all over, talking Bastian to see Toy Story 3 on Saturday and then I am escaping for a day of sewing on Sunday.
So apart from being Mum, which is a job I love don't get me wrong and working on the paperwork required to help get this up and running there has not been alot of time for sewing.
For last months guild sewing day I decided to start a new project... yes ladies and gentleman, my name is Kirsty and I have a slight problem. I like to start projects...... and never get them finished. I decided to start the "Life is a Celebration" Block of the Month that is running in the homespun magazine in 2010.
Monday, May 24, 2010
And now we are up to date
I was lucky enough to be able to go to AQC when Lachie was 2 weeks old were we had a lovely time, it was quite a weird experience in that at times neither Esther (who was "wearing" 4mth old Hannah) and myself (who was "wearing" Lachie) could take a step without some one coming over to gush at the babies. I was quite restrained with my spending this year compared to last year I only brought a kit to make Lachie "Little Monsters" quilt and the pattern for the King George III quilt seen here I am using all my stash of material for my DJ quilt to make this one.
I then went to Stitches and Craft Show once again "wearing" Lachie were I was even more restrained with my purchases. All I bought were the patterns to make these little creatures
Sunday, May 23, 2010
I have been sewing as well.. I promise
C’s cot quilt – top all done about to be sent off to be be quilted and then needs to be bound
Cuddle Quilt for Bastian - quilt top done, just need to sandwich, quilt and bind, I am using Minky as the backing so am quilting this one myself
Single Bed Quilt for Bastian – Appliqué strips finished just need to cut remaining material strips and piece together and then send off for quilting
Finish Cross Stitch for Nursery – Finished, need to make a trip to frame store to frame and hang it
Cot Quilt for Emily – Quilt top
and pieced back both finished, sandwich ready for quilting
Bunting for Bastian’s room – Not started
Pram Quilt – Have all the materials for quilt top and back but not started
I also got some pyjama pants made for me to use in Hospital and a these cute little baby booties.
I had originally made these to gift to a different new little boy but one Lachlan arrived they seemed to mysteriously make there way to his room :)
Tuesday, March 9, 2010
Weekend Wrap up
Here was my list
- Finish work hours from this week - done and 2 hrs for this week as well, hopefully that means some more sewing time for me this week
- Sew backing for C's cot quilt together so I can drop it off to be quilted - didn't buy enough material so need to make a second trip to Spotlight
- Finish nieces messenger bag - Done
- Finish off blanket stitch on planes for Bastian Big Bed Quilt - Finished one of the two strips, hope to maybe get the rest done today
- Cut rest of material for Bastian Big Bed Quilt ready for last class Wednesday night - Hoping to do tonight or tomorrow
This is the bag I have made for my niece's 10th birthday
I am really happy with how it turned out, has given me the confidence to make the nappy bag that I am planning to make now. I used this tutorial but just left of the zip on the actual main bag part. The only thing I would do different next time is use a different interfacing, I don't like how this one has bubbled.
Also I managed to get one of the two appliqué strips finished for B's new bed quilt which is this quilt
There is actual three plans per strip but I found it two hard to take a photo with all three in it. The first and third plane on each strip are the same any way
Sunday, January 24, 2010
Monkeys & Lions continued
Friday, January 22, 2010
Introducing...
Friday, January 1, 2010
Maybe this a an omeno for a good quilty year!
Know I just have to decide how to quilt it, I have three different ways in mind, the first an all over stiple which I would most likely get professional done, the second quilting all over on the angle following the lines of the quilt, like this
and the third quilting the small "birds" on a angle and echoing the large "birds" triangles
What do you think?
As far as new year resoluation or plans, I am still working though my list that I did back here, so I might copy this over to the right hand side. I will be back at a later date to do a 2009 wrap up and post a few pics of my final 2009 projects.
Tuesday, December 1, 2009
Advent Blog-along - Day 1
Tomorrow I am planning to go to one of my favourite local bookshops so I am sure there will be many more Christmas books to read after then (not that we don't have heaps already :) )
I thought I should start this off with a list of projects that I have to get finished between now and not only Christmas by when the baby comes in April
Items to finish before the baby comes
Quilt C's Quilt
Make Bastian cuddle quilt
Make Bastian big boy bed quilt
Make Bunting for Bastian new room
Finish Cross Stitch ABC Sampler for baby's room - 80% complete
Make Dilly bag for LQS Christmas Challenge - due 17 April
Quilt for K's baby - due 27 April
Pram quilts for my baby and K's Baby with left over material, if have time - due 27 April
I think that will be plenty for me to do between now and then and I am sure that I will add some extra things along the way and of course I have DJ blocks to complete along they way as well as the binding for a quilt that was quilted back in May
Sunday, November 22, 2009
Round Robin Block Swap
Anyway here are the pics of the 8 completed ones so far, the other 4 are still a WIP, 2 are cut out and the other two still to be done. They will be this weeks project




